TW Tesla w bloku
● Highland

Trip to the mountains (1/4) - to Kraków!

Yesterday the road conditions were almost spring-like, although I'd planned for a winter drive. The route looked like this:

Translated from Polish with AI assistance. Read the original →

G
Grzegorz
Author
26 January 2025 · 2 min read
Model 3TeslaRoad trip

Yesterday the road conditions were almost spring-like, although I'd planned for a winter drive. The route looked like this:

Budimex Mińsk Mazowiecki -> Sheraton Kraków

The car was loaded to the brim - the boot packed to the top and plenty of stuff on the rear seats too, so the weight was comparable to four passengers. The car is a TM3 LR HL, picked up at the end of September 2024; current battery degradation according to Tessie is 1.1%, and according to S3XY Buttons 3.4%. Mileage is 14.5k km.

Trip details:

  • Started at 82% charge; 27% was left on arrival in Kraków.
  • On the way, a short charge at the Supercharger in Radom. The Tesla suggested 5 minutes would be enough to arrive with 10%, but we spent 20 minutes there shopping and left with 75%.
  • Speeds: A2 - 140 km/h, then via S2 -> S79 -> S7 according to the limits.
  • I don't recommend the Radom Centrum (Potworów) exit - the asphalt suddenly ends for 100 m, which at 90 km/h at night can deliver quite a thrill.

Energy consumption:

  • To Radom, with a cold battery (charged on AC), consumption was 21 kWh/100 km.
  • From Radom, with the battery warmed up, consumption dropped to 17.6 kWh/100 km, although the last 25 km led along roads through villages (90->50->90).

Travel time:

  • The total journey time was exactly 4 hours.
  • The detour to Radom cost us about 40 minutes - Google Maps showed the route should take 3:20.
  • Shopping made the stop longer, but it was useful.

Stats from Tessie:

  • Mińsk -> Radom: 154 km, 32.36 kWh
  • Radom -> Kraków: 192 km, 33.86 kWh
  • Total: 66.22 kWh

Costs:

  • Charging in Mińsk (DKV AC) - 95 PLN (28->82%)
  • Charging in Radom (SuC) - 55 PLN
  • Total: 150 PLN

Summary:

Covering 350 km is doable if you stick to the speed limits. Initially we planned to charge the car to 95% and drive without a break, but my wife's shopping changed our plans. Mińsk lacks a decent charger at a shopping centre, which affected our decisions.

Consumption of 66.5 kWh is about 90% of the battery capacity - some of the energy went on heating. Road conditions were good, with no wind and no heavy vehicles on the route.

The Warsaw-Kraków route still leaves a lot to be desired in terms of charging infrastructure. The options available are either a SuC at the cost of 20 minutes, or expensive options at Shell stations.

Plans for the rest of the trip:

Tomorrow we head to Wisła, and on Thursday to Katowice. On Friday, the Katowice -> Warsaw (Heliotropów) route (320 km), starting at 100%. Half the way is the A1, the other half via the S8/S2 to the Greenway on Heliotropów, where I want to use the promotional 15 kWh.

We'll see what percentage is left on arrival at the Greenway!

← Previous post
A quick summary before our mountain trip
Next post →
Mountain trip (2/4) - heading for Szczyrk

Read next

ESC

Start typing - searches titles, text and tags.

Up/Down navigate Enter open Cmd-K / / search static index - no server